Built in parallel.

Rollout management for multi-unit food brands. Every unit open on time and on budget.

Book a 20-minute call
DallasCharlotte TampaArlington Brooklyn Your team Parallel

Alongside your team, not across the table.

We act as your owner's representative: on your side, never the contractor's. Your landlord, architect and contractor each have their own interests. We check their work and push every project forward for you. Your team stays focused on running stores.

LandlordArchitectContractor You Parallel

Every phase on its own track.

Most openings run one step after another. We start permits, bids and long-lead equipment as early as each one allows. The tracks overlap and your opening date moves up.

One step after another 12345 In parallel 12345 Weeks earlier

Five phases. One team.

  1. Site review

    Check power, gas, water, grease, exhaust and zoning before you sign. Review the landlord work letter and TI terms.

  2. Design and permits

    Adapt your prototype to the site, coordinate the architect and engineers, and push permits and health approvals through.

  3. Bidding

    Invite the right contractors, level every bid line by line, and negotiate. You see every number.

  4. Construction

    Weekly site reviews, schedule control, pay application checks and a firm line on change orders.

  5. Equipment and opening

    Kitchen equipment specs and orders, final inspections, certificate of occupancy, punchlist and handover to your team.

Unit 1, North Texas. On time. Under budget.

Fast casual franchisee, multi-unit deal, new market. About 3,000 sf former retail box. No local GC, no permit contacts.

  1. Week -3

    Site walk. Four deal breakers found before signing.

    On siteNeeded
    Power200A, 208V 3-phase400A service. Switchgear: 22 weeks.
    Gas1" low pressure650 CFH at 2 psi, new meter
    GreaseNone1,000 gal exterior interceptor
    HVAC2 x 5-ton RTUs20 tons, 12 ft hood, 2,900 CFM makeup air
  2. Week -1

    Landlord pays for the 400A service and the interceptor.

    Negotiated before signing. Rent start tied to permit issuance.

  3. Week 0 Parallel track

    Design, utility and signage start the same week.

    Switchgear is the critical path, so it goes first.

  4. Week 4 Parallel track

    Same kitchen. Half the trenching. Design fitted to the building.

    GPR scan of the slab before layout. Floor sinks and drains grouped along the existing sewer line. Indirect drains wall-mounted where code allows. Hood placed under existing roof framing. Nothing changes for the kitchen team.

  5. Week 8 Parallel track

    Permits in. Bids out. Same day.

    Building via expeditor, health plan review and liquor license filed together. Bid set to three GCs during city review.

  6. Week 11 Parallel track

    -24% on the GC contract Under target before a wall went up.

    Scope gaps closed, sales tax treated as a capital improvement, second bidder kept as leverage. Kitchen equipment leveled across dealers and bought direct. Long-lead items released.

  7. Week 14

    Permit issued. Every date locked in one kickoff.

    GC, architect, equipment, signage, and the client's ops, IT and marketing teams.

  8. Weeks 15 to 25

    Build. Change orders answered in 48 hours.

    Weekly site meetings. Pay apps checked against progress.

  9. Week 26

    Building, fire and health finals. CO.

  10. Week 27

    Open. On the date set at kickoff.

$137K savedOn one GC contract, before construction started
$144/sfConstruction cost. Texas market runs $200 to $375.
On timeOpening date held from kickoff. $0 tenant cost for power and grease.

Five sites. One report.

Every week you get one report for all your units: schedule, budget, change orders and the decisions we need from you.

Three ways to work with us.

Site Check

One site, before you sign.

  • Power, gas, grease, HVAC and zoning review
  • Landlord work letter and TI gaps
  • Written report with cost ranges

Fixed fee per site

Bid & Buy

One project, from bid set to contract.

  • GC bids leveled line by line
  • Negotiation with full transparency
  • Kitchen equipment leveled and bought direct

Fixed fee per unit

Full Rollout

Every unit, site review to opening.

  • All five phases, on parallel tracks
  • Change orders handled within your limit
  • One weekly report for all units

Fixed fee per unit or % of cost

Book a 20-minute call

Our interests never cross yours.

A fixed fee per unit or a percentage of construction cost, agreed before any work starts. No markups and no referral fees from contractors or vendors. We are paid by you only.

One budget. Your limits. We decide inside them.

You approve the budget and the contingency. You set the approval limit. We handle every change order below it within 48 hours, and you see each one in the weekly report. Anything above the limit, or anything that touches your brand or opening date, comes to you.

  • Franchisees with a development agreement for 2 to 20 units
  • Emerging brands opening in a new region
  • Cafés, bakeries, QSR, fast casual and specialty food retail
  • Teams without in-house construction, or with one at capacity
Your interests Ours

Tell us about your rollout.

Share where you are and what's next. We reply within one business day to set up a short call.

We use your details only to reply to you. See our privacy policy.

Privacy policy

Last updated: September 2026

Who we are

Parallel is an owner's representation service based in Miami, Florida. Contact: contact@builtinparallel.com.

What we collect

Only what you enter in the contact form: name, company, email, phone if provided, brand, number of planned units, target markets, project stage and your message.

Why we use it

To reply to your request, schedule a call and discuss your project. We do not sell, rent or share your information with anyone for their marketing.

Where it is stored

Form submissions are processed and stored by our hosting provider, Netlify, and forwarded to our business email.

Cookies and analytics

This site may use advertising and analytics tools, such as Meta and Google, to measure visits and ad performance. These tools may set cookies. You can block them in your browser settings.

How long we keep it

Up to 24 months after our last contact with you, unless we start working together.

Your choices

You can ask us at any time to see, correct or delete your information by emailing us at the address above. We will act on your request within 30 days.